This project involved a C6 refurbishment and PRM modifications programme on 8 class 153 vehicles at our workshop in Long Marston. The project scope includes full exterior re-livery, installation of UAT, interior refresh, seat re-configuration and at-seat power installation.
Chrysalis Rail delivered this project on our client’s premises at Barton Hill, Bristol. Similar to the 150 FGW project, we removed all existing coating on the exterior of the vehicle, completed corrosion repair work and primed the vehicle before painting and applying decals. This project was the first to take place in our new PaintRoom.
This project has recently taken place at our own depot at Long Marston on 9 vehicles. This included full exterior re-livery, corrosion repairs, installation of Webasto Auxiliary Heaters, replacement of coupler connection boxes and brake controllers.